Construction 2005-2006

May 25, 2006


Stairs being assembled

Dining room

Kitchen

June 2006
May 2006
April 2006
March 2006
February 2006
January 2006
December 2005
November 2005
October 2005
September 2005
August 2005



Right: Bartok studio entrance

Elevator waiting to be
assembled




Shared bathroom on the
first residential floor

Shared bathroom on the
second residential floor




May 18, 2006

View from Telemann Studio

View from Couperin
(administrative building)

South-West Elevation



Bartok Studio

Concert Hall storage space

Kitchen

A first residential floor
private bathroom


Shared bathroom on the
second residential floor

Second residential floor




May 12, 2006

Veranda under construction
(Lake side)




Concert Hall


Kitchen

Reception

Tuck shop


Lake level

Bartok Studio

Foreground: Franz Liszt
Studio, background:
Zoltan Kodaly Studio


Second residential floor

First residential floor room




May 5, 2006
Aerial photos were taken on May 1st, courtesy of Simon (Héli-Tremblant / Wheelair)

Veranda under construction
(North side)

Freshly painted baseboards

CAMMAC Executive Director
Raymond Sealey

Concert Hall


Veranda at the end of
the lobby

Kitchen

Future windows beside
the Music Library

Electric panels in the
mechanical room

Stairs in front of the
Music Library



First residential floor room


Elevator shaft

Second residential floor